Solar Panel Installation
Solar Panels on the Costa del Sol – Done Right
Certified solar panel installation near you. Across Marbella, Estepona, Fuengirola and all of Málaga Province. 330+ completed projects since 2022. Fixed-price quotes, full permits, 5-year support.

330+
Projects
5.0
3–5yr
Warranty
Turnkey Installation
Solar Power Plant Installation for Your Home or Business
A Kidi Solar installation includes a site visit across the Costa del Sol and Andalucía, measurements, engineering calculations, equipment selection, delivery, mounting, connection, start-up and a full system check. Efficiency, safety and longevity depend on installation quality – that is why we only use certified engineers.
At the design stage we analyse your roof or land, inclination, orientation and shading, then select proven equipment with warranties of up to 5yr. Typical projects run from 4 to 10 days depending on size and complexity.
Get a Free Quote
How a solar power plant works
Panels convert sunlight into electricity. When production matches your demand, you use it on-site. When you generate more than you need, surplus can feed the grid (net metering) or charge a battery, or build credit with some retailers (see virtual battery). Real-time monitoring lets you track output and optimise usage from your phone.
What we handle for you
- Site survey, roof/land analysis and system sizing
- Engineering project, community approval and Junta paperwork
- Premium panels & inverters with up to 5yr warranty
- Grid connection, commissioning and 5-year monitoring
- Certificates required by your electricity company
- Price ceilings agreed with you in advance
Solar Panel Prices on the Costa del Sol — 2026
Solar systems on the Costa del Sol typically range from 3–6 kWp for apartments and townhouses to 10–20 kWp for villas, and the cost is around €950 per kWp before battery storage. Battery storage is priced separately, from €2,000 for a 16 kWh battery. Prices are for a complete turnkey installation, including VAT, professional installation, permits, legalisation and grid connection.
| System Size | Price (incl. VAT) | Payback |
|---|---|---|
| Small (3–6 kWp) Apartment, townhouse | €2,850–€5,700 | ~3.5 years |
| Medium (7–10 kWp) House, villa | €6,650–€9,500 | ~3.5 years |
| Large (10–15 kWp) Villa with pool and A/C | €9,500–€14,250 | ~3.5 years |
| Premium (15–20 kWp) Large villa, heat pump, EV charging | €14,250–€19,000 | ~3.5 years |
| Battery storage (16 kWh) Added to any system above | From €2,000 | — |
Every property is different, so we recommend a free on-site survey to determine the right system size, expected annual production, savings and payback for your home or villa. Get a free quote or see prices for your town on our city pages, such as Marbella.
Solar Panels, Inverters and Batteries We Install
We install AIKO, LONGi, JA Solar, Astronergy, Jinko and Trina panels (up to a 25-year performance warranty) with Growatt, Huawei and Deye inverters and batteries. We choose the equipment for your roof, consumption and budget, and size a battery when you want evening power and backup during outages. See also our battery storage page.
Roofs on the Costa del Sol are often flat or tiled, and we choose tilt frames or flush mounting to suit the roof, orientation and shading.
Save Up to 90% on Bills
€2,000–4,000
avg. annual savings
The average homeowner on Costa del Sol saves €2,000–€4,000 per year after switching to solar. With net metering, you can even sell surplus energy back to the grid.
Clean & Sustainable Energy
4 tonnes
CO₂ saved per year
Every kWh of solar energy prevents ~0.5 kg of CO₂ from entering the atmosphere. A typical Marbella home installation prevents 3–5 tonnes of CO₂ annually.
Energy Independence
24/7
energy independence
Never worry about grid outages or rising electricity prices again. With battery storage, your home stays powered 24/7 using 100% clean energy.
How It Works
From Contact to Clean Energy in 4 Steps
01
Free Survey
Our engineer visits your property, analyses your energy bill and assesses your roof or land.
02
Custom Design
We design a system sized exactly for your consumption, budget and available space.
03
Permits & Paperwork
We handle the full engineering project, community approval, Junta submission and grid licence.
04
Installation & Go Live
Our team installs your system in 4-10 days and hands you a fully commissioned, monitored system.
Our Work
Solar Panel Projects on Costa del Sol
-

20 Solar Panels Installation in Benahavís
Project details Location: Benahavís Solar panels: 20 × AIKO Black Edition 510 W (10.2 kWp) Inverter: Growatt WIT 10K-HU three-phase hybrid inverter,…
20 x AIKO Black Edition 510W panels~€2,900/year savings3.7 years payback -

12 Solar Panels Installation in Guadalmina, Marbella
Project details Location: Guadalmina, Marbella Property: villa Solar panels: 12 × Jinko 620 W (7.44 kWp) Inverter: Growatt three-phase hybrid inverter, 6…
12 x Jinko 620W panels~€2,100/year savings~3.5 years payback -
60 Solar Panels Installation in Sierra Blanca, Marbella
Project details Location: Sierra Blanca, Marbella Solar panels: 60 × AIKO Black Edition 515 W (30.9 kWp) Inverter: Growatt three-phase hybrid inverter,…
60 x AIKO Black Edition 515W panels4.2 years payback -

20 Solar Panels Installation in Benalmadena
Project details Location: Benalmádena Property: office Solar panels: 20 × JA Solar 500 W (10 kWp) Inverter: Huawei SUN2000-10K-MAP0 Mounting: dedicated aluminium…
JA solar 500W panels~€2860/year savings~3.5 years payback -

12 Solar Panels Installation in Ojen
Project details Location: Ojén Property: townhouse Solar panels: 12 × AIKO 510 W (6.12 kWp) Inverter: Growatt MIN 6000TL-XH2 hybrid inverter Battery…
AIKO 510 W panels~€1,700/year savings~3.5 years payback -

21 Solar Panels Installation in Estepona
Project details Location: Estepona Property: mobile home Solar panels: 21 × JA Solar 500 W (10.5 kW) Inverter: Growatt WIT 10K-HU three-phase…
JA Solar 500W panels~€2860/year savings~3.5 years payback
Service Area
Serving All of Costa del Sol
From Málaga to Gibraltar, Kidi Solar operates across the entire Costa del Sol. Our local team means faster survey appointments, lower travel costs, and engineers who know your area.
-
Solar panels, batteries and backup power for villas in Sierra Blanca, Marbella. Free survey, full permits and monitoring included.
-
Solar panels, batteries and backup power for villas in La Zagaleta, Benahavís. Free survey, full permits and monitoring included.
-
15+ installations
Kidi Solar installs 15+ solar PV systems across Benahavis. Apartments, residential villas. Full permits and monitoring included.
-
330+ installations
KiDi Solar installs solar panels, battery storage and EV charging systems across the Costa del Sol, from Málaga to Marbella, Estepona and Sotogrande. We provide complete turnkey solar…
-
5+ installations
Kidi Solar installs solar panel systems in Ronda and inland Málaga Province — ideal for rural fincas, off-grid properties and cortijos. Free survey, full permits, no travel surcharge.
-
9+ installations
Kidi Solar installs solar panel systems near Sotogrande, La Línea, San Roque and all of Campo de Gibraltar. Luxury villa, hotel and commercial installations. Full permits, English &…
Get In Touch
Mon–Fri 9:30–20:30 · Sat 11:00–15:00
Reply within 2 hours
Serving all Costa del Sol
Same-week appointments
Fuengirola
Mijas
Sotogrande
Ojen
Nerja
Ronda
La Zagaleta
Sierra Blanca
Real Customer Reviews
What Our Clients Say
★★★★★ 5.0 / 5
Clients who trust us on the Costa del Sol
FAQ
Frequently Asked Questions
How much does a solar panel installation cost in Spain?
The cost depends on system size, consumption, roof type, equipment and whether battery storage is included. Typical turnkey prices: 3 kWp €2,850, 5 kWp €4,750, 8 kWp €7,600, 10 kWp from €9,500. KiDi Solar provides a free site survey and a personalised turnkey quotation.
The correct system size depends on your annual electricity consumption, daytime usage, available roof space, orientation and major loads such as air conditioning, swimming pools and EV charging. KiDi Solar analyses your electricity bills and property before recommending the system capacity.
Solar production depends on location, system capacity, panel orientation, shading and installation design. A typical 8–10 kWp system can generate approximately 14,000–18,000 kWh per year under suitable conditions on the Costa del Sol.
Most residential systems are installed in 4-10 days. Commercial projects usually take 10-14 days, with grid connection and final certification after that.
Our turnkey service includes site assessment, electricity consumption analysis, system design, solar panels, inverter, mounting structure, electrical components, professional installation, testing, commissioning, permits, legalisation and the required grid connection documentation.
Yes. KiDi Solar manages the required technical documentation and legalisation process and prepares the documentation needed to arrange compensation for surplus solar electricity with your electricity supplier.
KiDi Solar installs solar systems across the Costa del Sol and Málaga Province, including Marbella, Estepona, Benahavís, Mijas, Fuengirola, Benalmádena, Torremolinos, Málaga, Ojén, Nerja, Casares, Manilva, Sotogrande, Ronda and surrounding areas.
Yes. For 2026, Real Decreto-ley 7/2026 lets owners deduct 10% (20% for owners of a dwelling in a residential building) of what they pay for a self-consumption installation, on a base capped at €5,000 per year, for payments made in 2026. Local tax reductions (the ICIO construction tax and the IBI property tax) depend on your municipality, and we check the Ayuntamiento’s rules for your property. Subsidy programmes in Andalusia change over time, and where your project qualifies we prepare the required technical certificates and documentation. This is guidance, not tax advice.
Free Solar Survey
Find Out Exactly
How Much You Can
Save This Year
Get a personalised solar proposal — including system size, estimated savings, payback period and financing options. Completely free, no obligation, no pushy sales.
- Free on-site survey within the week
- Custom savings calculation for your home
- No-obligation written proposal
- Installation in 4-10 days
Get a Free Quote
Fill in the form and we’ll be in touch within 2 hours.