Project at a Glance
Project details
- Location: Guadalmina, Marbella
- Property: villa
- Solar panels: 12 × Jinko 620 W (7.44 kWp)
- Inverter: Growatt three-phase hybrid inverter, 6 kW
- Battery storage: 5 kWh
- Mounting: flat roof
- Handover: legalisation and registration of the installation completed, certification provided to the client
- Installation time: 3 days
Why This System Size
The system uses 12 Jinko 620 W panels (7.44 kWp) with a 5 kWh battery. We size every system from the electricity bill and the usable roof area measured on site.
If you are weighing storage for a similar home, see our guide on whether a battery is worth it, and our overview of solar panel installation in Marbella.
How We Did It, Step by Step
1. Survey and design
- We visit the property and measure the roof to see how much area is usable.
- We analyse the electricity bill to understand how much energy the home uses and when.
- We size the system from the consumption and the roof area.
2. Quote, contract and delivery
- We send a written proposal with the system size, equipment and price.
- After the contract is agreed, we deliver the mounting structure and the equipment.
3. Installation
- Mounting structure: panels installed on the flat roof.
- Panels and cabling: we installed the 12 panels and the DC and AC cabling.
- Protection: electrical protection devices were installed.
- Inverter and battery: the hybrid inverter and the 5 kWh battery were installed and connected to the property and the grid.
- Configuration: system configuration and monitoring setup.
4. Handover and monitoring
- Legalisation: we completed the legalisation and registration of the installation.
- Certification: the client received the corresponding certification.
Grants and Savings
Savings depend on consumption, the tariff and the surplus price, so we calculate them separately for each property. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.
Aftercare Included
- 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
- Panels and inverters are covered by the manufacturer warranties
- Monitoring set up for the system
Location: Guadalmina, Marbella
Questions About This Project
It is a 7.44 kWp hybrid solar and battery system: 12 Jinko 620 W panels, a Growatt three-phase hybrid 6 kW inverter and a 5 kWh battery.
We combine the usable roof area measured on site with the consumption shown on the electricity bill (how much and when the home uses energy). The system is then sized to fit both.
KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Panels and inverters are covered by the manufacturer warranties. Read the warranty policy.
Want a System Like This for Your Home?
Book a free survey. We visit your property, measure the roof, analyse your electricity bill and send you a written proposal with the system size, equipment and price.
