20 Solar Panels Installation in Guadalmina, Marbella

Marbella Hybrid Solar + Battery

  • 10 kWp System size
  • 20 x Longi 500W Panels
  • ~€2860/year Savings
  • ~3.5 years Payback

20 Solar Panels Installation in Guadalmina, Marbella

Project at a Glance

Location Marbella
System Size 10 kWp
Solar Panels 20 x Longi 500W
Inverter Growatt WIT 10K-HU
System Type Hybrid Solar + Battery

Project details

  • Location: Guadalmina, Marbella
  • Solar panels: 20 × LONGi 500 W (10 kWp)
  • Inverter: Growatt 10 kW hybrid inverter
  • Battery storage: installed with the hybrid system
  • Mounting: tiled roof, certified aluminium mounting system; fixing points prepared and waterproofed
  • Handover: legalisation and registration completed, required certification provided
  • Surplus energy: we assisted the client with surplus solar energy compensation with their electricity supplier
  • Estimated payback: about 3.5 years

Why This System Size

The system uses 20 LONGi 500 W panels (10 kWp) with a 10 kW Growatt hybrid inverter and battery storage, giving the property efficient solar generation, higher self-consumption and more energy independence. We size every system from the electricity bill and the usable roof area measured on site.

If you are weighing storage for a similar property, see our guide on whether a battery is worth it, and our overview of solar panel installation in Marbella.

How We Did It, Step by Step

1. Survey and design

  • We visit the property and measure the roof to see how much area is usable.
  • We analyse the electricity bill to understand how much energy the property uses and when.
  • We size the system from the consumption and the roof area.

2. Quote, contract and delivery

  • We send a written proposal with the system size, equipment and price.
  • After the contract is agreed, we deliver the mounting structure and the equipment.

3. Installation

  • Mounting structure: certified aluminium system on the tiled roof, with all fixing points prepared and waterproofed.
  • Panels and cabling: 20 panels with DC and AC cabling.
  • Protection: electrical protection devices.
  • Inverter and battery: hybrid inverter and battery connected to the property and the grid.
  • Configuration: system configuration, testing and monitoring setup.

4. Handover and monitoring

  • Legalisation: we completed the legalisation and registration of the installation.
  • Certification: the client received the required certification.
  • Surplus energy: we assisted with surplus solar energy compensation with the electricity supplier.

Grants and Savings

The estimated payback for this installation is about 3.5 years. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.

Aftercare Included

  • 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
  • Panels and inverters are covered by the manufacturer warranties
  • Monitoring set up for the system

Location: Guadalmina, Marbella

Areas Covered

El RosarioElviriaGuadalminaLa dama de nocheLas Chapaslos monterosMarbella CentroMontuaNueva AndalucíaPuerto BanúsSan Pedro de AlcántaraSierra Blanca

Questions About This Project

It is a 10 kWp hybrid solar and battery system: 20 LONGi 500 W panels, a 10 kW Growatt hybrid inverter and battery storage.

We combine the usable roof area measured on site with the consumption shown on the electricity bill (how much and when energy is used). The system is then sized to fit both.

The panels sit on a certified aluminium mounting system. All fixing points on the tiled roof were prepared and waterproofed for a secure, durable installation.

We assisted the client with arranging surplus solar energy compensation with their electricity supplier. The price depends on the supplier and the contract, so we do not quote a general figure.

The estimated payback for this installation is about 3.5 years. It depends on consumption, the tariff, the surplus price and available incentives, so we calculate it separately for each property.

KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Panels and inverters are covered by the manufacturer warranties. Read the warranty policy.

Want a System Like This for Your Home?

Book a free survey. We visit your property, measure the roof, analyse your electricity bill and send you a written proposal with the system size, equipment and price.

Free Solar Survey

Book a free survey — home visit, roof analysis and a custom proposal for your property.

Solar Installation by KiDi Solar

KiDi Solar provides complete solar energy solutions for residential properties across Marbella and the Costa del Sol.

  • Solar system design
  • Photovoltaic panel installation
  • Hybrid inverter installation
  • Battery storage systems
  • EV charging solutions
  • Aftercare & maintenance

Planning a Solar Installation in Marbella?

Free survey · Fixed price · All permits · Installation in 4–10 days