Project at a Glance
This 10.5 kW hybrid solar system in Estepona was completed by KiDi Solar as a full turnkey project. The project started with the construction of a custom steel structure above the mobile home. Our team fabricated the structure from steel profiles, applied protective primer and paint, and prepared it to support the complete photovoltaic system.
Once the steel structure was completed, we installed the aluminium mounting system and JA Solar 500W photovoltaic panels. The system was equipped with a Growatt WIT 10K-HU three-phase hybrid inverter and battery storage, fully connected to the property’s electrical network.
KiDi Solar completed the entire project from construction and electrical installation to system configuration, commissioning, legalisation and certification. We also assisted the client with obtaining a new electricity contract for surplus solar energy compensation.
Installation Process
The installation was carried out by the KiDi Solar team following the technical design prepared for the property.
-
Property & Roof Assessment
The available installation area, roof configuration and electrical system were assessed before the final photovoltaic layout was prepared.
-
Panel mounting and DC wiring
JA Solar 500W are fixed with certified mounting and wired to the inverter string inputs.
-
Inverter and battery integration
The Growatt WIT 10K-HU and — are connected, protected and configured for hybrid control.
-
Commissioning and handover
We test production, backup behaviour and monitoring, then hand over the Hybrid Plant 10,5kW system.