21 Solar Panels Installation in Estepona

Estepona Hybrid Plant 10,5kW

  • 10500W System size
  • JA Solar 500W Panels
  • ~€2860/year Savings
  • ~3.5 years Payback

21 Solar Panels Installation in Estepona

Project at a Glance

Location Estepona
System Size 10500W
Solar Panels JA Solar 500W
Inverter Growatt WIT 10K-HU
System Type Hybrid Plant 10,5kW

Project details

  • Location: Estepona
  • Property: mobile home
  • Solar panels: 21 × JA Solar 500 W (10.5 kW)
  • Inverter: Growatt WIT 10K-HU three-phase hybrid inverter
  • Battery storage: installed with the hybrid system
  • Mounting: custom steel structure built above the mobile home, with an aluminium mounting system on top
  • Handover: commissioning, legalisation and certification completed
  • Surplus energy: we assisted the client with a new electricity contract for surplus solar energy compensation
  • Estimated payback: about 3.5 years

Why This System Size

The system uses 21 JA Solar 500 W panels (10.5 kW) with a Growatt WIT 10K-HU three-phase hybrid inverter and battery storage. We size every system from the electricity bill and the usable roof area measured on site.

If you are weighing storage for a similar property, see our guide on whether a battery is worth it, and our overview of solar panel installation in Estepona.

How We Did It, Step by Step

1. Survey and design

  • We visit the property and measure the roof to see how much area is usable.
  • We analyse the electricity bill to understand how much energy the property uses and when.
  • We size the system from the consumption and the roof area.

2. Quote, contract and delivery

  • We send a written proposal with the system size, equipment and price.
  • After the contract is agreed, we deliver the mounting structure and the equipment.

3. Installation

  • Steel structure: the project started with a custom steel structure above the mobile home. Our team fabricated it from steel profiles, applied protective primer and paint, and prepared it to support the complete photovoltaic system.
  • Mounting and panels: we then installed the aluminium mounting system and the 21 JA Solar 500 W panels.
  • Inverter and battery: Growatt WIT 10K-HU three-phase hybrid inverter and battery storage, fully connected to the property’s electrical network.
  • Commissioning: system configuration and commissioning.

4. Handover and monitoring

  • Legalisation: we completed the legalisation and certification of the installation.
  • Surplus energy: we assisted with a new electricity contract for surplus solar energy compensation.

Grants and Savings

The estimated payback for this installation is about 3.5 years. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.

Aftercare Included

  • 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
  • Panels and inverters are covered by the manufacturer warranties
  • Monitoring set up for the system

Steel frame over the mobile home: a solar canopy

On this project we did more than install the panels, the inverter and a battery connected to the grid. Over the mobile home we also built a custom steel structure from 100 × 100 mm steel profile. We painted the profile, assembled the frame and mounted the 21 panels on top of it.

The result is a mobile home standing “under an umbrella”: the frame and the panels shade the house, so it is less hot inside, and the home also gets its own solar power plant.

Location: Estepona

Areas Covered

AtalayaBahía DoradaCanceladaCasares CostaEl ParaísoEstepona CentroLa DuquesaManilvaNew Golden MileSabinillas

Questions About This Project

It is a 10.5 kW hybrid solar system: 21 JA Solar 500 W panels, a Growatt WIT 10K-HU three-phase hybrid inverter and battery storage.

We combine the usable roof area measured on site with the consumption shown on the electricity bill (how much and when energy is used). The system is then sized to fit both.

We first built a custom steel structure above the mobile home from steel profiles, with protective primer and paint. The aluminium mounting system and the panels were installed on top of it.

We assisted the client with a new electricity contract for surplus solar energy compensation. The price depends on the supplier and the contract, so we do not quote a general figure.

The estimated payback for this installation is about 3.5 years. It depends on consumption, the tariff, the surplus price and available incentives, so we calculate it separately for each property.

KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Panels and inverters are covered by the manufacturer warranties. Read the warranty policy.

Want a System Like This for Your Home?

Book a free survey. We visit your property, measure the roof, analyse your electricity bill and send you a written proposal with the system size, equipment and price.

Free Solar Survey

Book a free survey — home visit, roof analysis and a custom proposal for your property.

Solar Installation by KiDi Solar

KiDi Solar provides complete solar energy solutions for residential properties across Estepona and the Costa del Sol.

  • Solar system design
  • Photovoltaic panel installation
  • Hybrid inverter installation
  • Battery storage systems
  • EV charging solutions
  • Aftercare & maintenance

Planning a Solar Installation in Estepona?

Free survey · Fixed price · All permits · Installation in 4–10 days