Project at a Glance
Project details
- Location: Sotogrande (Cádiz)
- Property: private villa
- Roof: pitched tile roof
- Solar panels: 40 × JA Solar 500 W (20 kW)
- Inverter: Fronius Symo 20 kW three-phase grid-tied inverter
- Battery storage: no battery installed
- Backup power: no backup function, as there is no battery
- Mounting: aluminium mounting structure for all panels
- Installed: 10 October 2022
- Paperwork: legalisation, certification and OCA inspection completed; all documents handed to the client after the installation
- Estimated savings: about €6,000 per year
- Estimated payback: about 3 years
Why This System Size
The system uses 40 JA Solar 500 W panels (20 kW) with a Fronius Symo 20 kW three-phase grid-tied inverter. We size every system from the electricity bill and the usable roof area measured on site, so the system matches the villa’s consumption and the space available on the roof.
Planning something similar? See our overview of solar panel installation in Sotogrande and our guide to solar panel installation costs in Spain.
How We Did It, Step by Step
1. Survey and design
- We visit the property and measure the roof to see how much area is usable.
- We analyse the electricity bill to understand how much energy the property uses and when.
- We size the system from the consumption and the roof area.
2. Quote, contract and delivery
- We send a written proposal with the system size, equipment and price.
- After the contract is agreed, we deliver the mounting structure and the equipment.
3. Installation
- Mounting: we fixed an aluminium mounting structure to the clay tile roof.
- Panels: we installed all 40 JA Solar 500 W panels on the aluminium structure.
- Inverter: the Fronius Symo 20 kW three-phase grid-tied inverter was connected to the villa’s electrical network.
- Commissioning: system configuration and commissioning on 10 October 2022.
4. Legalisation and handover
- We completed the legalisation, certification and OCA inspection, and handed all documents to the client after the installation.
Savings and Payback
The system is estimated to save about €6,000 per year on electricity, with an estimated payback of about 3 years. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.
Aftercare Included
- 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
- Panels and inverters are covered by the manufacturer warranties
- Monitoring set up for the system
Location: Sotogrande
Questions About This Project
It is a 20 kW solar system: 40 JA Solar 500 W panels on an aluminium mounting structure, with a Fronius Symo 20 kW three-phase grid-tied inverter.
Yes. On this private villa in Sotogrande we fixed an aluminium mounting structure to the clay tile roof and mounted all 40 panels on it.
We combine the usable roof area measured on site with the consumption shown on the electricity bill (how much and when energy is used). The system is then sized to fit both.
The estimated savings are about €6,000 per year and the estimated payback is about 3 years. Both depend on consumption, the tariff, the surplus price and available incentives, so we calculate them separately for each property.
The installation was completed and commissioned on 10 October 2022.
Yes. We completed the legalisation, certification and OCA inspection, and handed all documents to the client after the installation.
KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Panels and inverters are covered by the manufacturer warranties. Read the warranty policy.