11 kW EV Charger Installation in Ojén

Ojen EV Charger, Community Car Park

  • 11kW System size

11 kW EV Charger Installation in Ojén

Project at a Glance

Location Ojen
System Size 11kW
System Type EV Charger, Community Car Park

Project details

  • Location: Ojén
  • Property: parking space in the community car park of an urbanisation
  • Charger: Growatt 11 kW three-phase EV charger
  • Connector: Type 2
  • Supply: three-phase
  • Protection: dedicated circuit breaker and residual-current device (differential) installed
  • Installed: 28 April 2024
  • Contracted power: we contacted the distribution company and arranged the increase of the client’s contracted power, included in the price
  • Paperwork: electrical installation certificate (boletín) issued to the client

EV Charging in a Shared Car Park

The charger was installed at the client’s own space in the community car park of an urbanisation in Ojén. It runs on its own dedicated supply, protected by a separate circuit breaker and a residual-current device, so it does not affect the other parking spaces.

We Also Increased the Contracted Power

For an 11 kW charger to work properly, the client needed more contracted power than the existing electricity contract provided. We contacted the distribution company ourselves and arranged the increase, so the client did not have to deal with the paperwork. This service was included in the price.

Why an 11 kW Three-Phase Charger

An 11 kW charger needs a three-phase supply. It charges faster than a single-phase charger of about 7 kW, provided the vehicle can accept 11 kW of AC charging. The actual charging power depends on the available electrical supply and on the car. We choose between single-phase and three-phase chargers for each property after checking the electrical supply and the vehicle.

See our EV charger installation service and our EV charging cost comparison. If you also want solar, read about solar panel installation in Ojén.

How We Did It, Step by Step

1. Survey and design

  • We visited the car park and checked the electrical supply and the contracted power.
  • We planned the cable route from the electrical board to the parking space.
  • We confirmed the vehicle’s charging requirements.

2. Quote and booking

  • We sent a written proposal with the charger, the installation and the price.
  • After the proposal was agreed, we scheduled the installation.

3. Contracted power increase

  • The charger needed more power than the client’s contract allowed.
  • We contacted the distribution company ourselves and arranged the increase of the contracted power. This was included in the price.

4. Installation

  • We installed the Growatt 11 kW three-phase charger on the wall next to the parking space.
  • We ran a dedicated three-phase supply with its own circuit breaker and residual-current device (differential).
  • We tested the charger and set it up for use.

5. Certification and handover

  • We issued the electrical installation certificate (boletín) for the new circuit.
  • We showed the client how to use the charger.

Aftercare Included

  • 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
  • The charger is covered by the manufacturer warranty — see our warranty policy

Questions About This Project

A Growatt 11 kW three-phase EV charger with a Type 2 connector, installed at a parking space in the community car park of an urbanisation in Ojén.

Yes. Here the charger was installed at the client’s own parking space and connected to its own dedicated supply, so it does not affect the other spaces.

It has its own dedicated three-phase circuit with a separate circuit breaker and a residual-current device (differential).

Yes. We issued the electrical installation certificate (boletín) for the new circuit.

Yes. The charger needed more power, so we contacted the distribution company and arranged the increase of the contracted power for the client. This was included in the price.

The car park has a three-phase supply, so an 11 kW charger could be installed. It charges faster than a 7 kW single-phase charger, as long as the vehicle accepts 11 kW of AC charging.

KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. The charger is covered by the manufacturer warranty. Read the warranty policy.

Want an EV Charger Like This at Your Property?

Book a free survey. We assess your electrical supply, contracted power, cable route and vehicle requirements, and send you a written proposal with the charger, installation and price.

Free Solar Survey

Book a free survey — home visit, roof analysis and a custom proposal for your property.

Solar Installation by KiDi Solar

KiDi Solar provides complete solar energy solutions for residential properties across Ojen and the Costa del Sol.

  • Solar system design
  • Photovoltaic panel installation
  • Hybrid inverter installation
  • Battery storage systems
  • EV charging solutions
  • Aftercare & maintenance

Planning a Solar Installation in Ojen?

Free survey · Fixed price · All permits · Installation in 4–10 days