10 Solar Panels Installation in Mijas

Mijas 5 kW Hybrid Solar + 5 kWh Battery

  • 5 kWp System size
  • Longi 500W Panels
  • ~€1,430/year Savings
  • ~3.5 years Payback

10 Solar Panels Installation in Mijas

Project at a Glance

Location Mijas
System Size 5 kWp
Solar Panels Longi 500W
Inverter Growatt MOD 5000TL3-XH
System Type 5 kW Hybrid Solar + 5 kWh Battery

Project details

  • Location: Mijas
  • Solar panels: 10 × LONGi 500 W (5 kWp)
  • Inverter: Growatt MOD 5000TL3-XH three-phase hybrid inverter
  • Battery storage: 5 kWh
  • Mounting: aluminium mounting structure; roof waterproofed at all fixing points
  • Metering: smart energy meter
  • Handover: certification and legalisation of the installation completed
  • Surplus energy: we assisted the client with a new electricity contract for surplus solar energy compensation
  • Estimated savings: about €1,430 per year
  • Estimated payback: about 3.5 years

Why This System Size

Based on the client’s electricity bills and actual consumption, we calculated the required system size and assessed the available roof area to design an efficient solar and battery solution: 10 LONGi 500 W panels (5 kWp) with a 5 kWh battery.

If you are weighing storage for a similar property, see our guide on whether a battery is worth it, and our overview of solar panel installation in Mijas.

How We Did It, Step by Step

1. Survey and design

  • We visit the property and measure the roof to see how much area is usable.
  • We analyse the electricity bill to understand how much energy the property uses and when.
  • We size the system from the consumption and the roof area.

2. Quote, contract and delivery

  • We send a written proposal with the system size, equipment and price.
  • After the contract is agreed, we deliver the mounting structure and the equipment.

3. Installation

  • Mounting structure: aluminium structure, with the roof waterproofed at all fixing points.
  • Panels and cabling: 10 panels with DC and AC cabling.
  • Protection: electrical protection equipment.
  • Inverter and battery: Growatt three-phase hybrid inverter and 5 kWh battery.
  • Smart meter: a smart energy meter was installed.
  • Commissioning: the system was fully configured, tested and commissioned.

4. Handover and monitoring

  • Monitoring: we set up the monitoring application so the client can follow solar production, household consumption, battery charging and discharging, and energy exported to or imported from the grid in real time.
  • Legalisation: we completed the certification and legalisation of the installation.
  • Surplus energy: we assisted with a new electricity contract for surplus solar energy compensation.

Grants and Savings

Estimated savings for this installation are about €1,430 per year, with an estimated payback of about 3.5 years. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.

Aftercare Included

  • 2 free solar panel cleaning services during the first year
  • Ongoing remote system monitoring and technical support from KiDi Solar
  • 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
  • Panels and inverters are covered by the manufacturer warranties

Location: Mijas

Areas Covered

CalahondaEl FaroEntrerríosLa Cala de MijasLas Lagunas de MijasMijas CostaMijas PuebloSitio de Calahonda

Questions About This Project

It is a 5 kW hybrid solar system: 10 LONGi 500 W panels, a Growatt MOD 5000TL3-XH three-phase hybrid inverter and a 5 kWh battery.

Based on the client’s electricity bills and actual consumption, we calculated the system size and assessed the available roof area. The system is then sized to fit both.

Real-time solar production, household consumption, battery charging and discharging, and energy exported to or imported from the grid.

We assisted the client with a new electricity contract for surplus solar energy compensation. The price depends on the supplier and the contract, so we do not quote a general figure.

The estimated payback for this installation is about 3.5 years, with estimated savings of about €1,430 per year. It depends on consumption, the tariff, the surplus price and available incentives, so we calculate it separately for each property.

The project includes two free solar panel cleaning services during the first year and ongoing remote system monitoring and technical support. KiDi Solar also gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Read the warranty policy.

Want a System Like This for Your Home?

Book a free survey. We visit your property, measure the roof, analyse your electricity bill and send you a written proposal with the system size, equipment and price.

Free Solar Survey

Book a free survey — home visit, roof analysis and a custom proposal for your property.

Solar Installation by KiDi Solar

KiDi Solar provides complete solar energy solutions for residential properties across Mijas and the Costa del Sol.

  • Solar system design
  • Photovoltaic panel installation
  • Hybrid inverter installation
  • Battery storage systems
  • EV charging solutions
  • Aftercare & maintenance

Planning a Solar Installation in Mijas?

Free survey · Fixed price · All permits · Installation in 4–10 days