20 Solar Panels Installation in Mijas

Mijas Three-Phase Hybrid Solar + Battery, Solar Carport

  • 11 kWp System size
  • 20 x JA Solar 550W Panels
  • ~€3,600/year Savings
  • ~3.3 years Payback

20 Solar Panels Installation in Mijas

Project at a Glance

Location Mijas
System Size 11 kWp
Solar Panels 20 x JA Solar 550W
System Type Three-Phase Hybrid Solar + Battery, Solar Carport

Project details

  • Location: Mijas
  • Structure: pergolas over the garage, with no roof before the installation
  • Solar panels: 20 × JA Solar 550 W (11 kWp)
  • Inverter: Growatt MOD 10KTL3-XH three-phase hybrid inverter (10 kW)
  • Battery storage: 16 kWh battery
  • Optimisers: 4 optimisers on the 4 panels that fall into shade
  • Backup power: backup function installed, so the house keeps running when the grid goes down
  • Mounting: aluminium mounting structure on the pergolas
  • Installed: 7 July 2025
  • Handover: certification and legalisation included in the price
  • Estimated savings: about €3,600 per year
  • Estimated payback: about 3 years and 4 months

A Solar Carport: Panels That Became the Garage Roof

Above the garage there was no roof, only pergolas. We mounted the 20 panels on an aluminium structure on top of the pergolas, so the panels now close the pergolas and work as a roof. The cars are parked under cover, and the same surface produces electricity for the house.

Why This System Size

The system uses 20 JA Solar 550 W panels (11 kWp) with a Growatt MOD 10KTL3-XH three-phase hybrid inverter (10 kW) and a 16 kWh battery. We size every system from the electricity bill and the usable area measured on site.

Four of the panels fall into shade during part of the day, so we added an optimiser to each of them. This limits the effect of shading on the rest of the string.

Planning something similar? See our overview of solar panel installation in Mijas and our guide on whether a battery is worth it.

How We Did It, Step by Step

1. Survey and design

  • We visited the property and measured the pergolas over the garage to see how much area is usable.
  • We checked which panel positions fall into shade during the day.
  • We analysed the electricity bill and sized the panels, inverter and battery from the consumption and the available area.

2. Quote, contract and delivery

  • We sent a written proposal with the system size, equipment and price.
  • After the contract was agreed, we delivered the mounting structure and the equipment.

3. Installation

  • Mounting: we fixed an aluminium mounting structure to the pergolas above the garage.
  • Panels: we installed all 20 JA Solar 550 W panels, closing the pergolas so they now form a roof.
  • Optimisers: we fitted optimisers to the 4 shaded panels.
  • Inverter and battery: a Growatt MOD 10KTL3-XH three-phase hybrid inverter (10 kW) with a 16 kWh battery, connected to the property’s electrical network.

4. Legalisation and handover

  • Certification and legalisation of the installation were included in the price.

Savings and Payback

The system is estimated to save about €3,600 per year on electricity, with an estimated payback of about 3 years and 4 months. Incentives depend on the municipality, the date and the call, so we confirm them case by case. See our guide to solar subsidies in Andalucía.

Aftercare Included

  • 3-year warranty on the installation, extendable to 5 years after a free on-site inspection
  • Panels and inverters are covered by the manufacturer warranties
  • Monitoring set up for the system

Questions About This Project

It is an 11 kWp hybrid solar system: 20 JA Solar 550 W panels, a Growatt MOD 10KTL3-XH three-phase hybrid inverter (10 kW), a 16 kWh battery and 4 optimisers on the shaded panels.

Yes. Here we mounted the panels on an aluminium structure on top of the pergolas over the garage. The panels now close the pergolas and form a roof, so the cars are parked under cover.

Four of the panels fall into shade during part of the day. An optimiser on each of them limits the effect of that shading on the rest of the system.

We combine the usable area measured on site with the consumption shown on the electricity bill (how much and when energy is used). The system is then sized to fit both.

The estimated savings are about €3,600 per year and the estimated payback is about 3 years and 4 months. Both depend on consumption, the tariff, the surplus price and available incentives, so we calculate them separately for each property.

Yes. Certification and legalisation of the installation were included in the price.

KiDi Solar gives a 3-year warranty on the installation, extendable to 5 years after a free on-site inspection. Panels and inverters are covered by the manufacturer warranties. Read the warranty policy.

Want a System Like This for Your Home?

Book a free survey. We visit your property, measure the roof, analyse your electricity bill and send you a written proposal with the system size, equipment and price.

Free Solar Survey

Book a free survey — home visit, roof analysis and a custom proposal for your property.

Solar Installation by KiDi Solar

KiDi Solar provides complete solar energy solutions for residential properties across Mijas and the Costa del Sol.

  • Solar system design
  • Photovoltaic panel installation
  • Hybrid inverter installation
  • Battery storage systems
  • EV charging solutions
  • Aftercare & maintenance

Planning a Solar Installation in Mijas?

Free survey · Fixed price · All permits · Installation in 4–10 days