Project at a Glance
Installation Process
The installation was carried out by the KiDi Solar team following the technical design prepared for the property.
-
Property & Roof Assessment
The available installation area, roof configuration and electrical system were assessed before the final photovoltaic layout was prepared.
-
Panel mounting and DC wiring
— are fixed with certified mounting and wired to the inverter string inputs.
-
Inverter and battery integration
The — and — are connected, protected and configured for hybrid control.
-
Commissioning and handover
We test production, backup behaviour and monitoring, then hand over the — system.

